Friday, July 16, 2010

Inside started




I started priming and sealing the inside now and I ran 1 1/2" PVC for the motor controls and 3/4" PVC for the bow lights. All of this will be covered by the flooring to make a clean neat job. Rub rails next......

2 comments:

  1. what kind of deck are you planning to install? Are doing decking or using ply for a solid floor? also, are there instructions for outfitting drain plug, optional seats, ect. i'd like to cover gunwales/inwales, too & maybe have some storage on the sides.

    ReplyDelete
  2. I have two drain plugs in the transom. I plan on using 4/4 decking. I was going to cover the gunwales but I wanted open storage for rods. I should have pics of the decking up this week.

    ReplyDelete